The KOMAN family of companies offers high-value solutions with
low overhead, best-value pricing, and proven record of exceptional
performance ratings.
SWP Stormwater Plans, LLC is a full-service civil contractor offering excellent products and services at competitive prices.
The company was founded in 2005 on the principle that the client is the number one stakeholder in any project. It is our belief that a project can be profitable while still providing a 100% client satisfaction rating by ensuring that the needs of the client are the priority. Initially started as a civil engineering and consulting firm, SWP Contracting and Paving evolved from a specialty stormwater contractor, and now a renewed focus as a general contractor.
SWP specializes in general contracting, new pavement preservation and maintenance, underground construction, earthwork and excavating, demolition, major and minor concrete work and bridge repair and construction. We regularly perform work with alternate delivery methods such as JOC, CMAR and Design-Build with municipal and federal clients.
CAGE Code: 617P9
UEI: G1NKCBXYFLH3
Business Type: HUBZone, Small Disadvantaged Business, ANC-Owned, Indian Small Business Economic Enterprise (ISBEE)
Tish Creek Trail Bridge Replacement
The Tish Creek Trail Bridge was damaged by fallen trees during a major storm event. The bridge is located in the Columbia River Gorge- National Scenic Area on trail #440 at M.P. 2. By ground, the bridge is only accessible by trail.
The project work included:
Bridge Replacement, Mt. Hood National Forest Service: Prime Contractor
SWP was contracted by the United States Forest Service for the replacement of structure for an existing single span pressure treated timber trail bridge over Shady Creek, located within the Multnomah Falls Recreation Area, Bridal Veil, OR. The bridge was replaced with a steel beam and precast concrete superstructure. The project is located on the Larch Mountain Trail, #441, at MP 0.30, between the Multnomah Falls Lodge and the Benson Bridge in the Columbia River Gorge Scenic Area, in Section 7, T. 1 N., R. 6 E., Multnomah County, Oregon.
This was an award under the Region 6, Road & Bridge Construction and Repair 8(a) Set-Aside IDIQ. This project had an accelerated schedule. Project work included:
Ancillary items included developing and implementing an erosion control and environmental protection plan, developing and implementing a trail closure, and developing and implementing a pedestrian and traffic control plan.
Katherine Lake Bullhead, AZ: Prime Contractor PROJECT DESCRIPTION:
SWP performed a full depth, full-width 4R improvement of Katherine Access Road as the main roadway into the Katherine Access Marina. The 4R work included widening the roadway template; new drainage structures; improved pullouts adjacent to the roadway; paved entrance parking area; resurfacing existing Marina area parking lots and boat launch areas as well as the entrance station. The project also included new signage and safety improvements along the route.